We are pleased to take the lead with such an Environmental Eco-friendly
& Energy Efficiency application
as it is the first of its kind to be applied in Egypt for the cement industry.
Korra Energi has taken charge of the ‘Design & Build’ of the first ‘Waste Heat Recovery for Power Generation’ (WHRPG) project for Cement Industry in Egypt where wasted heat generated from the Pre-Heater and Air Quenching Coolers of the Two Production Lines will be recovered and converted into Electrical Power (20 Megawatts) saving around 30% of the factories electrical dependency, improving facility’s energy efficiency and Carbon Footprint.
Notable Insights
This project was selected among the 3 finalists for “Carbon Net-Zero Initiative of the year” by the big 5 Egypt Impact Award for 2023.
Plant Configuration
6 x WHRBs (81 t/h, 23 Bara, 390 ℃)
1 x 20MW STG
1 x Water Cooled Condenser
Awards
Top 3 Finalist for “Carbon Net-Zero Initiative of the year”