A 25% cut in natural gas consumption saving Egypt millions in hard currency.
Design and Build of a Tri-Generation Centralized Power Plant, generating (28 MWe – Gross Electrical Power, synchronized and load-shared with the Grid on 11 kV) + recovering (16 Tons/hr – Saturated Steam at 10 barg) + generating Chilled Water(430 RT)via Steam Absorption Chiller System, based on 10 years – BOOT contract.
Notable Insights
The First and largest Tri-generation plant in Egypt that was inaugurated by President Abd ElFattah Elsisi.
Overall system efficiency of 70%
Plant Configuration
3 x 9.3 Recip. Gas Engines (28MW)
3 x WHRB (15 t/h, 11 Bara, Sat.)
1 x Steam Fired Absorption Chiller (400 USRT)