Received project documents from tender dept. (Design drawings, BOQ, specs, tech. and commercial offer and final contract documents
Provide a list of shop drawings including durations and relations to planning dept. to prepare an achievable time schedule.
Design Review: Study and review project documentation and prepare all required
Requests for information (RFIs) for all missing, unclear, conflicting, or other technical matters that may arise during construction.
Proposing valuable engineering options without compromising quality.
Prepare All Required Technical Calculations for all trades.
Prepare Shop drawings and submit them to the consultant till getting (Code B) after coordinating with the procurement team to avoid conflicts between material submittals and shop drawings.
Coordinate with other depts (Civil., Elec. & Mech.) to Prepare coordination drawings.
Coordinate and support Arch. Dept to submit looking up and coordination drawings.
Attending Tech. meeting if needed.
Required Competencies and Behavior
_______
Required Competencies and Behavior
BSC. Arch. Engineering.
Minimum 2- 6 years experience as Arch. Technical Office Engineer.