Korra Logo
Loading...
2024
Sustainable Green EnergyIndustrial

Tri-Generation Plant - Petrochemical Complex

Client Name

Petrochemical Complex

Location

Abou Rawash

Application

Tri-Generation

Contract Type

BOOT

Status

Finished

The first & largest Tri-Gen power plant in Egypt

A 25% cut in natural gas consumption saving Egypt millions in hard currency

Design and Build of a Tri-Generation Centralized Power Plant, generating (28 MWe – Gross Electrical Power, synchronized and load-shared with the Grid on 11 kV) + recovering (16 Tons/hr – Saturated Steam at 10 barg) + generating Chilled Water (430 RT) via Steam Absorption Chiller System, based on 10 years – BOOT contract

Notable Insights
Notable Insights

The First and largest Tri-generation plant in Egypt that was inaugurated by President Abd ElFattah Elsisi. Overall system efficiency of 70%

Plant Configuration
Plant Configuration

3 x 9.3 Recip. Gas Engines (28MW) 3 x WHRB (15 t/h, 11 Bara, Sat.) 1 x Steam Fired Absorption Chiller (400 USRT)

Awards
Awards

Won the Smart Green Project Initiative Award

40,000

Tons of CO2 Emissions to be Reduced Yearly

25%

of Gas Consumption

70%

System Efficiencyy

184

GWhr Electricity Generated

Gallery

Project Gallery Image 1
Project Gallery Image 2
Project Gallery Image 3
Project Gallery Image 4
Project Gallery Image 5
Project Gallery Image 6
Project Gallery Image 7
Project Gallery Image 8
Project Gallery Image 9