Loading...
Client Name
Petrochemical Complex
Location
Abou Rawash
Application
Tri-Generation
Contract Type
BOOT
Status
Finished
The first & largest Tri-Gen power plant in Egypt
A 25% cut in natural gas consumption saving Egypt millions in hard currency
Design and Build of a Tri-Generation Centralized Power Plant, generating (28 MWe – Gross Electrical Power, synchronized and load-shared with the Grid on 11 kV) + recovering (16 Tons/hr – Saturated Steam at 10 barg) + generating Chilled Water (430 RT) via Steam Absorption Chiller System, based on 10 years – BOOT contract
Notable Insights
The First and largest Tri-generation plant in Egypt that was inaugurated by President Abd ElFattah Elsisi. Overall system efficiency of 70%
Plant Configuration
3 x 9.3 Recip. Gas Engines (28MW) 3 x WHRB (15 t/h, 11 Bara, Sat.) 1 x Steam Fired Absorption Chiller (400 USRT)
Awards
Won the Smart Green Project Initiative Award
Tons of CO2 Emissions to be Reduced Yearly
% of Gas Consumption
% System Efficiencyy
GWhr Electricity Generated