Loading...
2021Sustainability
Flare Gas Recovery Plant - Badr Petroleum
Raising Efficiency in Remote Locations Under Harsh Conditions and Without Halting Operation
Client
Badr Petroleum Flare Gas Recovery Plant
Location
Western Desert
Application
Flare Gas Recovery Plant for Gas Lift
Contract Type
TurnKey EPC
Status
Operating since 2021
Scope
Flare Gas Recovery and Gas Lift of (16 million Standard Cubic Feet per Day) that works with gas compressors of 1.25 megawatt each. The project is located in the Western Desert connecting natural gas with the main supply station. Due to the gas compressors immense size, we have constructed concrete base for each compressor with the dimensions of 17,5 meters (L) * 6,7 meters (W) * 2.2 meters (H), consuming 40 tons of steel and 514 tons of concrete for the two bases. It is worth adding that the tender for gas compressors was the largest in Egypt at that time.
Plant Configuration
2 x 16 MMSCFD Recip. Gas Engine Driven Reciprocating Compressors (16 MMSCFD)
Tons of CO2 reduced yearly