2021
Sustainable Green EnergyIndustrial

Flare Gas Recovery Plant - Badr Petroleum

Raising Efficiency in Remote Locations Under Harsh Conditions and Without Halting Operation

Client

Badr Petroleum Flare Gas Recovery Plant

Location

Western Desert

Application

Flare Gas Recovery Plant for Gas Lift

Contract Type

TurnKey EPC

Status

Operating since 2021

Scope

Flare Gas Recovery and Gas Lift of (16 million Standard Cubic Feet per Day) that works with gas compressors of 1.25 megawatt each. The project is located in the Western Desert connecting natural gas with the main supply station. Due to the gas compressors immense size, we have constructed concrete base for each compressor with the dimensions of 17,5 meters (L) * 6,7 meters (W) * 2.2 meters (H), consuming 40 tons of steel and 514 tons of concrete for the two bases. It is worth adding that the tender for gas compressors was the largest in Egypt at that time.


Plant Configuration
Plant Configuration

2 x 16 MMSCFD Recip. Gas Engine Driven Reciprocating Compressors (16 MMSCFD)

46,000

Tons of CO2 reduced yearly

Project Gallery Image 1
Project Gallery Image 2
Project Gallery Image 3