Korra Logo
Loading...
2023
Sustainability
Sustainable Green EnergyIndustrial

Flare Gas Recovery Plant - Eshpetco

Client

Eshpetco

Location

Hurghada

Application

Flare Gas Recovery

Industry

Oil & Gas

Contract Type

BOO

Status

Completed

Our Flare Gas recovery upstream project in Hurghada

Which was the first in Egypt to produce both Electricity & Natural Gas Liquids

The Flare Gas Recovery for NGL Fractionation & Independent Power Production project has a capacity of 1MMSCFD for 2MWE electrical power & 11 TPD NGL for phase one of our scope

Notable Insights
Notable Insights

It was chosen as the second-best environmental project, the highly commended, in Egypt, Africa & the Mediterranean by regional select-jury at EGYPS 2020

Plant Configuration
Plant Configuration

Gas Processing Plant (NGL: 10 Ton/day) 2 x 1.0MW Recip. Gas Engines (2.0MW)

Awards
Awards

Second-Best Environmental Project in 2020 by EGYPS

18,000

Tons of CO2 Emissions to be Reduced Yearly

3,900

Tons of Natural Gas Liquids Recovered

39

GWhr/yr Electricity to be Generated

3.8

Million Liters of Diesel Fuel Consumption Savedy

860

MMSCF Flaring Saved

Project Gallery Image 1
Project Gallery Image 2
Project Gallery Image 3
Project Gallery Image 4